Owner : | DESY |
General contractor : | Bilfinger Berger, Hochtief |
Application : | Soft-Eye |
FiReP Solution : | FiReP Rebar reinforcement as Soft-Eye |
Construction date : | 2009-2012 |
TBM information : | use of two TBM, length of tunnels: tunnel 1: 3084m, tunnel 2: 2693m |
Products : | P60 Permanent Rebar, straight material d=20mm, stirrups d=25mm |
General information : | 21 TBM break throughs, d-walls |