SMART Kuala Lumpur

Owner : Malaysian Highway Authority, Department of Irrigation and Drainage Malaysia
General contractor : MMCENG-Gamuda JV
Consultant :
Application : Soft-Eye
FiReP Solution : FiReP Rebar reinforcement as Soft-Eye
Construction date : 04/2005
TBM information : slurry shield TBM
diameter 13.2m
tunnel length: 9.7km

Products : FiReP Rebar straight 32mm, 22mm, stirrup 20mm
General information : SMART stands for "Stormway Management and Road Tunnel". There are two components the tunnel consists of: a stormwater tunnel and a motorway tunnel, making it the longest multi-purpose tunnel in the world.
2 TBM break throughs
FRP reinforced bore piles and d-walls