Downtown Line Stage 1; C902

Owner : Land Transport Authority
General contractor : Shanghai Tunnel Engineering Co. Ltd (STEC)
Application : Soft-Eye
FiReP Solution : FRP reinforcement for TBM break-through
Construction date : 10/2009
Products : FiReP Rebar straight d=30mm 
General information : 1 TBM break-through
FRP reinforced diapragm wall
Downtown Line Stage 1 was formely known as Downtown Extension of the Circle Line. The line runs 3.4 km fully underground. Construction time of Stage 1 began in 2007 and will last till 2012. Begin of operation will be in 2013. It will then run from Chinatown Station on the North East Line to Bugis Station on the East West Line, including 6 stations.