Owner : | Land Transport Authority |
General contractor : | Shanghai Tunnel Engineering Co. Ltd (STEC) |
Application : | Soft-Eye |
FiReP Solution : | FRP reinforcement for TBM break-through |
Construction date : | 10/2009 |
Products : | FiReP Rebar straight d=30mm |
General information : |
1 TBM break-through FRP reinforced diapragm wall Downtown Line Stage 1 was formely known as Downtown Extension of the Circle Line. The line runs 3.4 km fully underground. Construction time of Stage 1 began in 2007 and will last till 2012. Begin of operation will be in 2013. It will then run from Chinatown Station on the North East Line to Bugis Station on the East West Line, including 6 stations. |
Reference >