Owner : | ZAMG |
General contractor : | ÖSTU - STETTIN |
Consultant : | iC consulenten Ziviltechniker GesmbH |
Application : | Non metalic rock support |
FiReP Solution : | GRP mesh, GRP bolts |
Construction date : | 2010 - 2011 |
Excavation method : | NATM |
Products : | FiReP GRP Powermesh; FiReP K60-35, 25mm GRP Powerthread; L= 6.0m, 4.0m and 3.0m; FiReP GRP Nuts and GRP Plates |
General information : | The Conrad Observatory stage II will provide storage space for measuring and electronic equipment in a gallery with a length of approximately 1‘500 m. The complete gallery is constructed according to NATM in a difficult limestone ground. Especially the avoidance of magnetic materials such as steel reinforcement had to be considered during the construction process. Therefore the project tender allowed only GRP and plastic material to be applied. In the area of critical ground conditions in total 10.000 m2 of FiReP GRP Powermesh was used for reinforcing the shotcrete lining. For further anchorage support measures, 25mm FiReP GRP Powerthread bolts with GRP nuts and plates were installed. |
Jobsite Photos |
![]() |
![]() |
![]() |