Reference‎ > ‎

Chengdu Metro Limited

Owner : Chengdu Metro Limited
General contractor : 1. China Railway Stock
2. China Railway Group Co., Ltd.
3. Guangdong Foundation Engineering Company
4. China Tiesiju Civil Engineering Group Co. Ltd.
Consultant :  
Application : Soft-Eye
FiReP Solution : FiReP Rabar reinforcement for Soft-Eye
Construction date : 1. 09/2008
2. 04/2009
3. 07/2009
4. 09/2009
TBM information : 18.5 km long tunnel with 16 stations
Products : 1. FiReP Rebar straight d=25mm helix d=20mm
2. FiReP Rebar straight d=14mm, d=25mm helix d=12mm, d=14mm, d=20mm
3. FiReP Rebar straight d=28mm stirrup d=14mm, d=20mm, d=8mm
4. FiReP Rebar straight d=25mm stirrup d=20mm, d=12mm

General information : In the first stage of metro construction Line 1 was constructed. In the coming 30 years further 6 lines are planned.
 1.  1 TBM break-through
 2.  16 TBM break-throughs
 3.  16 TBM break-throughs
 4.  16 TBM break-throughs
all: FRP reinforced bore piles

Jobsite Photos