Owner : | Chengdu Metro Limited |
General contractor : | 1. China Railway Stock 2. China Railway Group Co., Ltd. 3. Guangdong Foundation Engineering Company 4. China Tiesiju Civil Engineering Group Co. Ltd. |
Consultant : | |
Application : | Soft-Eye |
FiReP Solution : | FiReP Rabar reinforcement for Soft-Eye |
Construction date : | 1. 09/2008 2. 04/2009 3. 07/2009 4. 09/2009 |
TBM information : | 18.5 km long tunnel with 16 stations |
Products : | 1. FiReP Rebar straight d=25mm helix d=20mm 2. FiReP Rebar straight d=14mm, d=25mm helix d=12mm, d=14mm, d=20mm 3. FiReP Rebar straight d=28mm stirrup d=14mm, d=20mm, d=8mm 4. FiReP Rebar straight d=25mm stirrup d=20mm, d=12mm |
General information : | In the first stage of metro construction Line 1 was constructed. In the coming 30 years further 6 lines are planned. 1. 1 TBM break-through 2. 16 TBM break-throughs 3. 16 TBM break-throughs 4. 16 TBM break-throughs all: FRP reinforced bore piles |